What's new on ADB.org, 09 May 2024: 12 items

Here is the latest list of content by ADB based on your preferences:

Procurement Notices (Goods and Works)

Construction of Eight Elevated Metro Stations viz. Ashokvan, Dongargaon, Mohgaon, Meghdoot CIDCO, Butibori Police Station, MHADA Colony, MIDC KEC and MIDC ESR in Reach-1A of the Nagpur Metro Rail Project Phase-2
https://www.adb.org/node/965966

Design and construction of elevated metro viaduct of length 17.624 km between Ch.21256.814 to Ch.38881.7 including railway spans of length 79m and 100m and a 6-lane double decker portion with vehicular underpass from CH 25755.211 to CH 26895.211
https://www.adb.org/node/965961

Project Information and Documents

Toward Sustainable and Conversion-Free Aquaculture in Southeast Asia: Technical Assistance Report
https://www.adb.org/projects/documents/reg-57221-001-tar

Safeguard Documents

Coastal Towns Climate Resilience Project: Construction and Improvement of 10 Roads under Bhedarganj Pourashava, Shariatpur District (Package No. e-GP/CTCRP/BHED/RD/01) Draft Land Acquisition and Resettlement Due Diligence Report
https://www.adb.org/projects/documents/ban-55201-001-sddr-22

Second Integrated Road Investment Program - Tranches 1, 2, and 3: Eastern Province Environmental Monitoring Report (January-December 2023)
https://www.adb.org/projects/documents/sri-50301-002-50301-003-50301-004-emr-8

Wyntron Electric Vehicle Charger Production Expansion Project: Final Initial Environmental and Social Examination
https://www.adb.org/projects/documents/phi-56236-001-iee-0

Second Integrated Road Investment Program - Tranches 1, 2, and 3: Uva Province Environmental Monitoring Report (January-December 2023)
https://www.adb.org/projects/documents/sri-50301-002-50301-003-50301-004-emr-9

Second Integrated Road Investment Program - Tranches 1, 2, and 3: Uva Province Social Monitoring Report (July-December 2023)
https://www.adb.org/projects/documents/sri-50301-002-50301-003-50301-004-smr-21

Balakot Hydropower Development Project: External Environmental Monitoring Report (July-December 2023)
https://www.adb.org/projects/documents/pak-49055-007-emr-5

Second Integrated Road Investment Program - Tranches 1, 2, and 3: Eastern Province Social Monitoring Report (July-December 2023)
https://www.adb.org/projects/documents/sri-50301-002-50301-003-50301-004-smr-22

Second Integrated Road Investment Program - Tranches 1, 2 and 3: Northern Province Social Monitoring Report (July-December 2023)
https://www.adb.org/projects/documents/sri-50301-002-50301-003-50301-004-smr-20

B.Grimm Viet Nam Solar Power Project (Dau Tieng Project): Environmental and Social Monitoring Report (April-September 2023)
https://www.adb.org/projects/documents/vie-54013-001-esmr-2


Looking to do business with ADB?

Check out our online one-stop shop Business Center and learn more about ADB’s Procurement. Service providers can bookmark ADB’s Institutional Procurement Notices.


Unsubscribe from this service.


No comments:

Post a Comment